Project Summary | ||
Type | Apartment | |
Bedroom | 2 BHK to 3 BHK | |
Bathrooms | 1 to 2 | |
Area | 853 Sq.ft to 1481 Sq.ft | |
Accessibility | Accessible by all public transport. Proposed Metro 9 km Airport 12 km. | |
Social Infrastructure | Close to the market, hospital, various educational institutions |
Structure:
RCC with bricks
Wall:
Internal: Wall Putty
External: High Quality waterproof acrylic paint
Floors:
Kota stone/vitrified tiles/anti-skid tiles
Electrical:
Concealed copper wiring with modular switches, adequate light & power points, standard main DB with MCB, TV/Telephone points.
Kitchen:
Dado of ceramic tiles upto the height of 30 inches above the cooking platform of granite, stainless steel sink with drain board.
Toilet:
Concealed pipeline, ceramic tiles dado uotp the height of door frame level, CP bath fittings, white sanitary fittings, PVC cisterns of reputed make with ISI mark.
Doors:
Water proof flush door in paint finish.
Windows:
Sliding aluminium windows with clear glass panes.
Lift:
Six/four passenger lift.
Water:
24 hour water supply.
Generator:
24 hour power back up for common area lighting. Available at nominal charges for each flat.
Seacurity Services:
24 hour security services.
Realtech Nirman Pvt. Ltd.