Lemon Botany

Andul Road,Kolkata
Project Summary  
  • Residential
  • |
  • 2 to 4 BHK
  • |
  • 1020 Sq.ft to 1630 Sq.ft
  • `34.7 Lac - `55.4 Lac
    Average Price Range : `34.7 Lac to `55.4 Lac

Land Area : 3 Bigha's of Land

Total Flats : 125 Apartments in 3 blocks of G+10

Accessibility : Easily accessible by all modes of Public Transport, fast accessibility to Kolkata through Vidyasagar Setu.

Social Infrastructure : Reputed engineering college, schools,hospitals, market and malls in close vicinity.

Amenities

  1. Temple with meditation area
  2. Gym with changing rooms
  3. Community hall with kitchen & toilets, indoor games area
  4. Trolleys (for goods) and wheelchair for disabled people
  5. One small pharmacy (preferable doctor’s chamber also)
  6. Changing & rest area for security people
  7. Driver’s sitting area
  8. Garden for children and old people with walking pathway & benches for old people.
  9. One office space of the Association along with a help desk & store
  10. Fountains, trees and bushes
  11. Adda area for residents
  12. Servant quarter with toilets & bathrooms on each floor
  13. A garbage disposal centre (recycle plant – optional)
  14. High security cameras at various sensitive points.(optional)
  15. Goomty on exit & entrance of project.
  16. Intercom. Video Door Phone
  17. Information system (for inside as well as outside).
  • Outside

      An electrical board displaying following info on the main gate

            (a) Temperature

            (b) Time

            (c) Addreses

            (d) Bus No going to different places

            (e) Name of Project.

  • Inside

       Showing different places.

            Visitors & doctors car parking.

             Fire fighting system.

             Well decorated lobby.

             Terrace garden with proper water proofing.

             In house Ambulance

             Wi-fi (optional)

             Amphitheatre

 

Specifications

A.     CONSTRUCTION:

  1. Structure – RCC frame.
  2. Outer wall- 200/250 mm thick brick work
  3. Inner wall- 125mm thick brick wall
  4. Elevation- weather coat paint.

B.     ELECTRICALS:

1.      Outer

  1. Electrical room containing LT panel.
  2. Space for transformer.
  3. Space for DG set.
  4. Underground cabling.
  5. Individual electrical meters on the ground floor of each building.

2.      Inside

  1. Concealed copper wiring (FRLS) from DB to different stations in the apartment though PVC pipes. Havells, Finolex or equivalent make
  2. Modular switches & power points of reputed brands.Crabtree,Anchor,Legard or equivalent make
  3. MCB switches for AC in every bedroom & living room.Havells,Legard or equivalent make
  4. Bedrooms  - 1 fan, 3lights,1 Ac switch & 2 plug points

                    Kitchen – 1 fan, 2 lights, 1 exhaust, 3 plug points

                   Toilets- 2 light, 1 exhaust,1 geyser point,1 plug point & 1 fan

                   Living- 4/5 lights, 2 fans, 3 plug points & 1 ac (optional)

                  Automatic changeover for generator supply.

C.     FLOORING:

1.      Common area

  1. Passage – vitrified / ceramic tiles / marbles.
  2. Staircase & landing – kota /marble.
  3. Parking & other areas of ground floor.
  • Pavers in different colours combination
  • Checkered tiles

Roof.

  • Concrete with tiles

2.      Inside

  1. Bedroom / living & dining – Vitrified tiles with 100 mm skirting.
  2. Toilet –Anti skid Ceramic tiles on the floor & Ceramic tiles on the wall upto door height.
  3. Kitchen – Ceramic tiles on the floor, 2 feet wide L shaped platform of black Granite with 100 mm skirting. Ceramic tiles above Granite skirting (2 feet high).

D.     WALL FINISH:

  1. Common area – as per architect’s choice.
  2. In apartments – smooth plaster of paris finish / wall putty.

E.     PLUMBING & SANITARY:

a.      Outside

  • Drainage line by C.I/R.C.C hume pipes with pits & manholes covers at defined spaces.
  • Sewage treatment plant (STP).
  • SWR pipe from each toilet/pantry/roof (rainwater) connected to main drainage system.
  • Connection from UGWR to overhead tank on the roof of above each building.
  • Ring line circulating on the internal side of parapet wall to cater to toilet all around the building (PVC pipes).
  • Rainwater harvesting / Rainwater storage (optional)

b.      Internal plumbing

  1. Concealed pipeline made of CPVC/G.I for different places such as shower area, basin area, and cistern, commode shower in toilets and two connections in kitchen (one for utensil wash & one for drinking water).
  2. Detail of sanitary ware & C.P fitting (toilets & kitchen)

-          One commode (with cistern/without cistern (flush valve)Hindware/Parryware or equivalent make

-          One wash basin (with and without pedestal) Hindware/Parryware or equivalent make

-          One commode shower. Jaquar, Ess Ess or equivalent make

-          Angular stop cocks. Jaquar, Ess Ess or equivalent make

-          Bottle trap (optional). Jaquar, Ess Ess or equivalent make

-          One mixer/Bib cock on basin. Jaquar, Ess Ess or equivalent make

-          One shower set. Jaquar, Ess Ess or equivalent make

Kitchen

-          One sink cock. Jaquar, Ess Ess or equivalent make

-          Angular stop cock. Jaquar, Ess Ess or equivalent make

-          S.S sink with trap.Nirali or equivalent make

 

F.      ELEVATORS: High speed elevators. (person capacity) Otis or Mitsubishi 

G.    DOORS: 

  1. Main door- flush door having veneer on both sides. Century/Kitply/Greenply
  2. Inside doors- flush door having one side veneer & other side commercial. Century/Kitply/Greenply
  3. Door window- as per design by architect made with good quality sal with glasses.
  4. Frame- made of sal wood (preferably Malaysian sal)
  5. Locks- one high security locks in the main door & round locks on inside doors.Godrej Make

H.    WINDOWS :

Aluminum/CPVC/UPVC windows

I.       STAIRCASE RAILING:

  1. Railing made of mild steel as per design by architect.
  2. Top is made of kapur wood or aluminum.

 

J.      FIRE PROTECTION SYSTEM (for more than four storied buildings):

  1. An adequate site for fire UGR on the ground floor.
  2. Sprinkler system as per the approval drawing & suggestion.
  3. Total pipes of mild steel (MS).
  4. Fire alarm system as per the guidelines of W.B.F.S
  5. Concealed risen lines for sprinkler and hose reel system (at each landing of staircases)
  6. Fire extinguishers at different places as per the guidelines.

K.    WATERPROOFING:

  1. On the walls (both sides) of the UGR
  2. All Toilets.
  3. Roof.

 

Developers

LEMON CONSTRUCTIONS

The foundation of Lemon was laid in the year 2005 by five directors of the company to construct commercial, residential, and entertainment projects.

A quiet beginning laid the strong foundation of the working mechanism of the company with emphasis on quality over quantity.

With honesty, integrity and innovation being the mantra of our company, the company strives to gain respect, trust and confidence of their stack holders.

Vision

To be the change they wish to see in the real estate world

By creating landmarks

Ensuring no difference between their commitment and delivery of products & services

To be a thoughtful real estate developer

Mission

They will make products that meet the latent needs of the consumer, backed by service that outperforms his expectations

Their product will recognize no competition more important than themselves. They will constantly compete with themselves

They will continue to improve and add value to their products.


Architect

AMBER CHATTERJEE

Enquire about Lemon Botany

whatsapp